Weighing and loading of oil rig elements
At the beginning of 2013, commissioned by Vistal we designed and made a transhipment two elements (Bridge 965 tons and 254 tons Flare) allocated to the drilling platform in the North Sea. Both elements have been weighed by our system of load cells and then loaded onto a pontoon sea travel by hydraulic skidding.